Project information checklist for structural steel fire protection.

Use this printable checklist to collate the issued steel, system, substrate, access and programme information that makes an early scope conversation more useful.

Discuss the project

Use before a scope review

A planning prompt, not a design approval.

This list helps a project team collect practical information before discussing access, preparation and application. It does not determine a coating thickness, select a system, certify compliance or replace the project’s responsible design, fire-engineering or manufacturer information.

Checklist

Collect what helps define a practical delivery route.

Tick items that are available. Missing information is useful to identify early; it can be assigned to the correct project, design or system party before mobilisation is considered.

Project and design starting point

Gather the issued information that frames the allocated coating package.

Steel and substrate information

Describe the condition of the actual steel before an application route is assumed.

Access, interfaces and programme

Make the live workface, sequencing and protection constraints visible before a site review.

Scope conversation

Prepare a useful initial discussion without treating this list as a technical approval.

Continue planning

Use the completed pack to start the right conversation.

For wider work-package planning, use the structural-steel fire-protection guide. For a structured explanation of specification readiness, use the intumescent coating specification guide.