UK-wide structural steel fire protection
07721 375756

Project evidence · Doncaster

Structural steel coating at HB Tunnelling.

First-party footage and photographs from a Premier Blasting project, showing the access, masking and application environment behind the finished coating.

First-party video Powered access Spray application
01

The visible workface.

The project media shows coating being applied to structural members from mobile elevated work platforms. Adjacent areas and platform rails are protected to control overspray around the active workface.

02

Access was part of the application method.

Trusses, beams and intersecting members required the operative to change position and spray angle. The footage demonstrates why access planning should be reviewed against the actual steel geometry rather than treated as a separate plant item.

03

What this evidence does—and does not—show.

These assets show Premier Blasting carrying out structural steel coating work. Product identity, fire-performance ratings and compliance cannot be inferred from photographs alone.

Expanded project record

More detail from the active workface.

A wider visual record of the steel frame, powered access and live application environment captured during the project.

Mobile elevated work platform positioned alongside a structural steel beam for coating access.
Positioning the platform for coverage
Operative in a red powered access platform working beside structural steel members.
Working safely around elevated steel
Protective-coating team and powered access beneath a large structural steel frame.
The practical scale of on-site spraying
Structural steel frame and access platform during controlled protective-coating work.
Application within an active structure
Wide project view of structural steelwork, access equipment and support plant.
Project coordination at site scale
Portrait wide view of an operative and structural steelwork from a powered access platform.
Access and application in view
Message usWhatsApp