Start with the required performance
Provide the fire-resistance period, limiting temperature where available, specified product system and the coating schedule or steel section information.
Describe the actual starting condition
New primed steel, weathered steel and retained painted steel create different preparation risks. Primer identity and condition photographs are valuable.
Show how the work can be reached
Dimensions, elevations, obstructions, available platforms, live-site restrictions and intended work hours all influence the delivery plan.
Project note
Final product selection, thickness and acceptance criteria must follow the approved tested system, responsible design and project specification. This article is contractor guidance, not a substitute for project fire engineering.