01

Off-site application can move work earlier

Controlled shop conditions can support application before erection, but transport, lifting, connections and site repairs remain part of the final system.

02

On-site application follows the erected frame

Site spraying can include connections and repaired areas in one sequence, while requiring access, masking, environmental control and coordination with other trades.

03

The right route is project-specific

Programme, architecture, handling, environment, access and responsibility for repairs should be compared before procurement.

Project note

Final product selection, thickness and acceptance criteria must follow the approved tested system, responsible design and project specification. This article is contractor guidance, not a substitute for project fire engineering.

Relevant local planning

Put this guidance into a local project context.

These planning guides help organise site, access, and programme information for suitable mobile work packages. They do not imply a permanent local office.

Discuss a project